{"id":915,"date":"2019-11-19T12:38:43","date_gmt":"2019-11-19T12:38:43","guid":{"rendered":"https:\/\/www.iso-saudi.net\/blog\/?p=915"},"modified":"2019-12-14T12:28:12","modified_gmt":"2019-12-14T12:28:12","slug":"top-points-required-to-be-implemented-for-iso-22301-certification","status":"publish","type":"post","link":"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/","title":{"rendered":"Top points required to be implemented for ISO 22301 certification."},"content":{"rendered":"<p><strong><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-985\" src=\"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/bc-11.jpg\" alt=\"\" width=\"361\" height=\"139\" srcset=\"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/bc-11.jpg 361w, https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/bc-11-300x116.jpg 300w\" sizes=\"auto, (max-width: 361px) 100vw, 361px\" \/><\/strong><\/p>\n<p><strong>Top points required to be implemented for ISO 22301 certification\u00a0<\/strong><\/p>\n<p><b>Setting up a management committee<\/b><\/p>\n<p><span style=\"font-weight: 400;\">To look into the process of business continuity management system a specialized and a dedicated committee must be formed who will make planning, estimate the organizational outputs, allocate the resources and performe periodical testing and auditing. The senior management committee will study the existing structure of the plan, assign the tasks to individuals and create the necessary staff responsible for developing and executing the business continuity plan.<\/span><\/p>\n<p><b>Business Impact Analysis<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Identifying the critical business services to ensure their recovery and delivery to prevent loss of revenue after the crisis.<\/span><\/p>\n<p><b>Business Continuity Detailed Response and Recovery Plan<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Identifying all possible threats and risks, developing a response and recovery processes must be done following the Business impact analysis\u00a0<\/span><\/p>\n<p><b>Training<\/b><\/p>\n<p><span style=\"font-weight: 400;\">This includes training staff on their specific functions in the time of a disaster.\u00a0<\/span><\/p>\n<p><strong>Maintenance<\/strong><\/p>\n<p><span style=\"font-weight: 400;\">Provide periodic assessment and maintenance to ensure uninterrupted continuity plans. <\/span><\/p>\n<p>&nbsp;<\/p>\n<p><b>\u201cFor ISO 22301 Certification, ISO 22301 Consultancy, ISO 22301 Consultants, ISO 22301 requirements, in Riyadh, Jeddah, Dammam, Jubail, Yanbu, Hofuf drop an email to info@iso-saudi.net\u201d<\/b><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Top points required to be implemented for ISO 22301 certification\u00a0 Setting up a management committee To look into the process [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":985,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[96],"tags":[97,98,99,257],"class_list":["post-915","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-iso-22301","tag-iso-22301-certification","tag-iso-22301-consultancy","tag-iso-22301-consultants","tag-iso-22301-requirements"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Top points required to be implemented for ISO 22301 certification. - ISO Saudi Arabia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Top points required to be implemented for ISO 22301 certification. - ISO Saudi Arabia\" \/>\n<meta property=\"og:description\" content=\"Top points required to be implemented for ISO 22301 certification\u00a0 Setting up a management committee To look into the process [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/\" \/>\n<meta property=\"og:site_name\" content=\"ISO Saudi Arabia\" \/>\n<meta property=\"article:published_time\" content=\"2019-11-19T12:38:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-12-14T12:28:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/bc-11.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"361\" \/>\n\t<meta property=\"og:image:height\" content=\"139\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/#\/schema\/person\/d8b33624737a3c0e53b36522a4f404fd\"},\"headline\":\"Top points required to be implemented for ISO 22301 certification.\",\"datePublished\":\"2019-11-19T12:38:43+00:00\",\"dateModified\":\"2019-12-14T12:28:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/\"},\"wordCount\":189,\"publisher\":{\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/bc-11.jpg\",\"keywords\":[\"ISO 22301 Certification\",\"ISO 22301 Consultancy\",\"ISO 22301 Consultants\",\"ISO 22301 requirements\"],\"articleSection\":[\"ISO 22301\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/\",\"url\":\"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/\",\"name\":\"Top points required to be implemented for ISO 22301 certification. - ISO Saudi Arabia\",\"isPartOf\":{\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/bc-11.jpg\",\"datePublished\":\"2019-11-19T12:38:43+00:00\",\"dateModified\":\"2019-12-14T12:28:12+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/#primaryimage\",\"url\":\"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/bc-11.jpg\",\"contentUrl\":\"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/bc-11.jpg\",\"width\":361,\"height\":139},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.iso-saudi.net\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Top points required to be implemented for ISO 22301 certification.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/#website\",\"url\":\"https:\/\/www.iso-saudi.net\/blog\/\",\"name\":\"ISO Saudi Arabia\",\"description\":\"ISO Saudi Arabia\",\"publisher\":{\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.iso-saudi.net\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/#organization\",\"name\":\"ISO Saudi Arabia\",\"url\":\"https:\/\/www.iso-saudi.net\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/logo-1.png\",\"contentUrl\":\"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/logo-1.png\",\"width\":181,\"height\":38,\"caption\":\"ISO Saudi Arabia\"},\"image\":{\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.iso-saudi.net\/blog\/#\/schema\/person\/d8b33624737a3c0e53b36522a4f404fd\",\"name\":\"admin\",\"sameAs\":[\"http:\/\/9558030567f6cd9afb9be1c2f5fc56bf\"],\"url\":\"https:\/\/www.iso-saudi.net\/blog\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Top points required to be implemented for ISO 22301 certification. - ISO Saudi Arabia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/","og_locale":"en_US","og_type":"article","og_title":"Top points required to be implemented for ISO 22301 certification. - ISO Saudi Arabia","og_description":"Top points required to be implemented for ISO 22301 certification\u00a0 Setting up a management committee To look into the process [&hellip;]","og_url":"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/","og_site_name":"ISO Saudi Arabia","article_published_time":"2019-11-19T12:38:43+00:00","article_modified_time":"2019-12-14T12:28:12+00:00","og_image":[{"width":361,"height":139,"url":"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/bc-11.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/#article","isPartOf":{"@id":"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/"},"author":{"name":"admin","@id":"https:\/\/www.iso-saudi.net\/blog\/#\/schema\/person\/d8b33624737a3c0e53b36522a4f404fd"},"headline":"Top points required to be implemented for ISO 22301 certification.","datePublished":"2019-11-19T12:38:43+00:00","dateModified":"2019-12-14T12:28:12+00:00","mainEntityOfPage":{"@id":"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/"},"wordCount":189,"publisher":{"@id":"https:\/\/www.iso-saudi.net\/blog\/#organization"},"image":{"@id":"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/#primaryimage"},"thumbnailUrl":"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/bc-11.jpg","keywords":["ISO 22301 Certification","ISO 22301 Consultancy","ISO 22301 Consultants","ISO 22301 requirements"],"articleSection":["ISO 22301"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/","url":"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/","name":"Top points required to be implemented for ISO 22301 certification. - ISO Saudi Arabia","isPartOf":{"@id":"https:\/\/www.iso-saudi.net\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/#primaryimage"},"image":{"@id":"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/#primaryimage"},"thumbnailUrl":"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/bc-11.jpg","datePublished":"2019-11-19T12:38:43+00:00","dateModified":"2019-12-14T12:28:12+00:00","breadcrumb":{"@id":"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/#primaryimage","url":"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/bc-11.jpg","contentUrl":"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/bc-11.jpg","width":361,"height":139},{"@type":"BreadcrumbList","@id":"https:\/\/www.iso-saudi.net\/blog\/top-points-required-to-be-implemented-for-iso-22301-certification\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.iso-saudi.net\/blog\/"},{"@type":"ListItem","position":2,"name":"Top points required to be implemented for ISO 22301 certification."}]},{"@type":"WebSite","@id":"https:\/\/www.iso-saudi.net\/blog\/#website","url":"https:\/\/www.iso-saudi.net\/blog\/","name":"ISO Saudi Arabia","description":"ISO Saudi Arabia","publisher":{"@id":"https:\/\/www.iso-saudi.net\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.iso-saudi.net\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.iso-saudi.net\/blog\/#organization","name":"ISO Saudi Arabia","url":"https:\/\/www.iso-saudi.net\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.iso-saudi.net\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/logo-1.png","contentUrl":"https:\/\/www.iso-saudi.net\/blog\/wp-content\/uploads\/2019\/11\/logo-1.png","width":181,"height":38,"caption":"ISO Saudi Arabia"},"image":{"@id":"https:\/\/www.iso-saudi.net\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.iso-saudi.net\/blog\/#\/schema\/person\/d8b33624737a3c0e53b36522a4f404fd","name":"admin","sameAs":["http:\/\/9558030567f6cd9afb9be1c2f5fc56bf"],"url":"https:\/\/www.iso-saudi.net\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.iso-saudi.net\/blog\/wp-json\/wp\/v2\/posts\/915","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iso-saudi.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iso-saudi.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iso-saudi.net\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iso-saudi.net\/blog\/wp-json\/wp\/v2\/comments?post=915"}],"version-history":[{"count":5,"href":"https:\/\/www.iso-saudi.net\/blog\/wp-json\/wp\/v2\/posts\/915\/revisions"}],"predecessor-version":[{"id":986,"href":"https:\/\/www.iso-saudi.net\/blog\/wp-json\/wp\/v2\/posts\/915\/revisions\/986"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iso-saudi.net\/blog\/wp-json\/wp\/v2\/media\/985"}],"wp:attachment":[{"href":"https:\/\/www.iso-saudi.net\/blog\/wp-json\/wp\/v2\/media?parent=915"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iso-saudi.net\/blog\/wp-json\/wp\/v2\/categories?post=915"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iso-saudi.net\/blog\/wp-json\/wp\/v2\/tags?post=915"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}